Documents and Resources

The various reports and documents gathered or commissioned by the Committee are listed below.  They include historical documents including a feasibility study from 2009 and a space needs study conducted in 2015 as well as analyses of the building systems and current conditions. 

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Documents & Resources10 documents

  • Fire Station Feasibility Study Report December 2021
    document seq 0.00
  • Fire Station Geotechnical Report
    document seq 0.00
  • Feasibility Study - Kaestle Boos Architects 2009
    document seq 0.00
    Feasibility Study
  • Mold Investigation Report - 2019
    document seq 0.00
    Report
  • Fire Station Energy Savings Report - Design Development Phase June 2022
    document seq 0.00
  • Septic Tank Inspection Report April 2022
    document seq 0.00
  • Fire Station Space Needs Analysis Report 2015
    document seq 0.00

Committee Charge3 documents

  • Original Fire Station Building Committee Charge January 2021
    document seq 1.00
  • Amended Fire Station Building Committee Charge April 2022
    document seq 2.00
  • Amended Fire Station Building Committee Charge March 2024
    document seq 3.00